Vidant Medical Center: West Tower + NICU

DESIGN & CONSTRUCTION ADMIN VIDANT MEDICAL CENTER: WEST TOWER + NICU LOCATION: WASHINGTON, DC REI provided Contract Documents + Construction Administration for the removal of the existing roofing system to the structural deck. A temporary roof was installed in cold adhesive. Installed light-weight insulating concrete to R25. Installed FiberTite 50 mil XT membrane fully adhered. […]

Cone Health: Hospital Roof Condition Assessment

hospital roof condition assessment CONE HEALTH LOCATION: GREENSBORO, NC REI conducted site visits to review the condition of the roof to determine the need for remediation. Our team took digital photographs to highlight areas of concern + illustrate discrepancies due to age, application, design or material performance. Each roof sector was rated, using a scale […]

Lexington Medical Center: Tower Expansion

TOWER EXPANSION 550,000 SF LEXINGTON MEDICAL CENTER LOCATION: COLUMBIA, SC REI provided a survey to determine if moisture was present within the existing roof system, utilizing a Flir ThermaCam B1 infrared camera to identify areas with significant heat differentials, or anomalies can be caused by wet insulation. The IR camera readings were confirmed with a […]