REI provided the design for the roof replacement of Myrtle Beach International Airport (MYR).
The scope of work included removal of the existing roof system, replacement of all wet insulation and provided a new roof system, along with sheet metal flashing + accessories to provide a complete, watertight, warrantable roof assembly to meet all current SC building codes.
REI created Construction Documents and provided Construction Administration for this project, to ensure the design was as intended in the built environment.